{"id":5417,"date":"2025-09-13T15:24:09","date_gmt":"2025-09-13T08:24:09","guid":{"rendered":"https:\/\/plc-corp.vn\/eng\/?p=5417"},"modified":"2025-09-13T22:49:49","modified_gmt":"2025-09-13T15:49:49","slug":"steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution","status":"publish","type":"post","link":"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html","title":{"rendered":"Steel Pipe Pile Extraction by Vibro Hammer on Barge Crane \u2013 Safe and Efficient Marine Solution"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_89 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\/#Introduction\" >Introduction<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\/#What_is_Steel_Pipe_Pile_Extraction_by_Vibro_Hammer\" >What is Steel Pipe Pile Extraction by Vibro Hammer?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\/#Step-by-Step_Process\" >Step-by-Step Process<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\/#Survey_and_Preparation\" >Survey and Preparation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\/#Mobilization_and_Positioning_of_Barge_Crane\" >Mobilization and Positioning of Barge Crane<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\/#Steel_Pipe_Pile_Extraction_with_Vibro_Hammer\" >Steel Pipe Pile Extraction with Vibro Hammer<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\/#Cleaning_and_Handover\" >Cleaning and Handover<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\/#Why_Choose_PLC\" >Why Choose PLC?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\/#Featured_Projects\" >Featured Projects<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\/#Service_Coverage\" >Service Coverage<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\/#Contact_Consultation\" >Contact &amp; Consultation<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"Introduction\"><\/span>Introduction<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>In marine and riverine construction such as ports, ferry terminals, embankments, or underground pipelines, <strong>steel pipe pile extraction<\/strong> is often a complex task. Traditional removal methods are time-consuming, costly, and may cause risks to surrounding structures.<\/p>\n<p><strong>Steel pipe pile extraction by vibro hammer on barge crane<\/strong>, provided by <strong>PLC Heavy Lifting Services JSC<\/strong>, offers a professional solution that is safe, fast, and cost-effective. With over 15 years of experience in heavy lifting and marine works, PLC has completed many large-scale projects across Vietnam.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5418\" src=\"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-1.jpeg\" alt=\"\" width=\"2048\" height=\"1536\" srcset=\"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-1.jpeg 2048w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-1-300x225.jpeg 300w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-1-1024x768.jpeg 1024w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-1-768x576.jpeg 768w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-1-1536x1152.jpeg 1536w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-1-86x64.jpeg 86w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-1-600x450.jpeg 600w\" sizes=\"(max-width: 2048px) 100vw, 2048px\" \/><\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_is_Steel_Pipe_Pile_Extraction_by_Vibro_Hammer\"><\/span>What is Steel Pipe Pile Extraction by Vibro Hammer?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>This method uses a <strong>hydraulic vibro hammer mounted on a barge crane<\/strong>. The vibro hammer generates strong vertical vibrations that reduce soil friction around the pile, allowing the crane to pull the steel pipe pile out smoothly.<\/p>\n<ul>\n<li>For piles <strong>only driven into soil<\/strong>: piles can be <strong>directly extracted by vibro hammer<\/strong>.<\/li>\n<li>For piles within a <strong>concrete foundation<\/strong>: the non-concreted section must be <strong>cut off<\/strong> before extraction.<\/li>\n<\/ul>\n<p><strong>Key advantages of steel pipe pile extraction by vibro hammer on barge crane:<\/strong><\/p>\n<ul>\n<li><strong>High efficiency:<\/strong> Shortens project duration, saves time and cost.<\/li>\n<li><strong>Safety:<\/strong> Minimizes vibration transmission, prevents damage to nearby structures.<\/li>\n<li><strong>Flexibility:<\/strong> Suitable for different soil conditions, pile diameters (up to \u00d81200\u2013\u00d81500 and larger).<\/li>\n<li><strong>Environmental compliance:<\/strong> Proper handling of cut sections, waste, and sludge.<\/li>\n<\/ul>\n<h2><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5420\" src=\"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-3.jpeg\" alt=\"\" width=\"2048\" height=\"1536\" srcset=\"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-3.jpeg 2048w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-3-300x225.jpeg 300w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-3-1024x768.jpeg 1024w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-3-768x576.jpeg 768w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-3-1536x1152.jpeg 1536w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-3-86x64.jpeg 86w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-3-600x450.jpeg 600w\" sizes=\"(max-width: 2048px) 100vw, 2048px\" \/><\/h2>\n<h2><span class=\"ez-toc-section\" id=\"Step-by-Step_Process\"><\/span>Step-by-Step Process<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Survey_and_Preparation\"><\/span>Survey and Preparation<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>Geological and hydrological survey, tide and current analysis.<\/li>\n<li>Assessment of pile dimensions, depth, and current condition.<\/li>\n<li>Development of <em>Method Statement<\/em>, <em>HSE plan<\/em>, and <em>barge positioning scheme<\/em>.<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Mobilization_and_Positioning_of_Barge_Crane\"><\/span>Mobilization and Positioning of Barge Crane<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>Transport barge crane to the worksite.<\/li>\n<li>Position barge with anchors or spuds for stability.<\/li>\n<li>Establish safe working zones and traffic control on water.<\/li>\n<\/ul>\n<h3><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5421\" src=\"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-4.jpeg\" alt=\"\" width=\"1024\" height=\"768\" srcset=\"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-4.jpeg 1024w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-4-300x225.jpeg 300w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-4-768x576.jpeg 768w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-4-86x64.jpeg 86w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-4-600x450.jpeg 600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/h3>\n<h3><span class=\"ez-toc-section\" id=\"Steel_Pipe_Pile_Extraction_with_Vibro_Hammer\"><\/span>Steel Pipe Pile Extraction with Vibro Hammer<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li><strong>Align and clamp:<\/strong> The crane lowers the vibro hammer to clamp the pile head securely.<\/li>\n<li><strong>Vibration:<\/strong> Gradually increase frequency and amplitude to loosen the pile.<\/li>\n<li><strong>Extraction:<\/strong> Combine vibration force with crane pulling to lift the pile vertically.<\/li>\n<li><strong>Special case \u2013 piles with concrete foundation:<\/strong>\n<ul>\n<li><em>Conventional solution:<\/em> Diver with mechanical cutter.<\/li>\n<li><em>Modern solution (recommended):<\/em> <strong>hydraulic cutting machine with alignment system<\/strong>, safer and more precise.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Pile handling:<\/strong> Place extracted piles onto barge or transport vehicle, secured properly.<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Cleaning_and_Handover\"><\/span>Cleaning and Handover<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>Collect cut sections and waste.<\/li>\n<li>Restore the site and waterways.<\/li>\n<li>Provide completion documents: daily logbook, pile location map, acceptance reports.<\/li>\n<\/ul>\n<h2><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5419\" src=\"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-2.jpeg\" alt=\"\" width=\"2048\" height=\"1536\" srcset=\"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-2.jpeg 2048w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-2-300x225.jpeg 300w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-2-1024x768.jpeg 1024w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-2-768x576.jpeg 768w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-2-1536x1152.jpeg 1536w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-2-86x64.jpeg 86w, https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-2-600x450.jpeg 600w\" sizes=\"(max-width: 2048px) 100vw, 2048px\" \/><\/h2>\n<h2><span class=\"ez-toc-section\" id=\"Why_Choose_PLC\"><\/span>Why Choose PLC?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li><strong>Proven expertise:<\/strong> Over 15 years of experience in heavy lifting, marine piling, and pile extraction.<\/li>\n<li><strong>Heavy-duty equipment:<\/strong>\n<ul>\n<li><strong>200-ton barge crane<\/strong>, auxiliary crawler\/mobile cranes.<\/li>\n<li><strong>Hydraulic vibro hammers 90\u2013120<\/strong>.<\/li>\n<li><strong>2,000-ton barges<\/strong>, spud systems, hydraulic cutting machines.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Professional operation:<\/strong> Certified engineers, operators, riggers, and signalmen.<\/li>\n<li><strong>Transparent pricing:<\/strong> Cost depends on soil condition, pile diameter\/depth, and project scope \u2013 always competitive.<\/li>\n<li><strong>Flexible service:<\/strong> Equipment rental, equipment + manpower, or turnkey pile removal services.<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Featured_Projects\"><\/span>Featured Projects<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li><strong>Nhat Tan Bridge (Hanoi):<\/strong> \u00d81200 pile extraction using <strong>200-ton crane and vibro hammer 90<\/strong>.<\/li>\n<li><strong>Binh Khanh Bridge (Ho Chi Minh City):<\/strong> \u00d81500 pile extraction with <strong>200-ton crane, vibro hammer 120, 2,000-ton barge<\/strong>.<\/li>\n<\/ul>\n<p>These projects demonstrate PLC\u2019s capability in <strong>steel pipe pile extraction by vibro hammer<\/strong> for large, complex infrastructure works.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Service_Coverage\"><\/span>Service Coverage<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><strong>PLC<\/strong> provides <strong>steel pipe pile extraction by vibro hammer on barge crane<\/strong> nationwide:<\/p>\n<ul>\n<li><strong>Northern Vietnam:<\/strong> Hanoi, Hai Phong, Quang Ninh, Nam Dinh, Thai Binh\u2026<\/li>\n<li><strong>Central Vietnam:<\/strong> Thanh Hoa, Nghe An, Quang Binh, Quang Tri, Thua Thien Hue, Da Nang\u2026<\/li>\n<li><strong>Southern Vietnam:<\/strong> Ho Chi Minh City, Ba Ria\u2013Vung Tau, Dong Nai, Long An, Tien Giang, Ben Tre, Ca Mau\u2026<\/li>\n<\/ul>\n<p>We also handle <strong>temporary pile removal, marine pipeline works, and other hydraulic structures<\/strong> on rivers and seas.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Contact_Consultation\"><\/span>Contact &amp; Consultation<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li>\ud83d\udcde <strong>Hotline:<\/strong> (+84) 974 612 609<\/li>\n<li>\ud83d\udce7 <strong>Email:<\/strong> info@plc-corp.vn<\/li>\n<li>\ud83c\udfe2 <strong>Office:<\/strong> 2nd Floor, Mai Linh Dong Do Building, 499 Luong The Vinh Street, Nam Tu Liem, Hanoi<\/li>\n<\/ul>\n<p><strong>\ud83d\udc49 Contact PLC today for free consultation and receive a detailed quotation for steel pipe pile extraction by vibro hammer within 24 hours.<\/strong><br \/>\n<strong>PLC<\/strong> ensures <em>safe \u2013 efficient \u2013 on-time solutions<\/em> for your marine and infrastructure projects.<\/p>\n<p><a href=\"https:\/\/plc-corp.vn\/eng\/mechanical-construction\" target=\"_blank\" rel=\"noopener\">PLC Mechanical Construction<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Introduction In marine and riverine construction such as ports, ferry terminals, embankments, or underground pipelines, steel pipe pile extraction is often a complex task. Traditional removal methods are time-consuming, costly, and may cause risks to surrounding structures. Steel pipe pile extraction by vibro hammer on barge crane, provided by PLC Heavy Lifting Services JSC, offers [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5421,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[95],"tags":[],"class_list":["post-5417","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mechanical-construction"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.8 (Yoast SEO v25.6) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Steel Pipe Pile Extraction by Vibro Hammer PLC<\/title>\n<meta name=\"description\" content=\"PLC provides professional steel pipe pile extraction by vibro hammer on barge cranes \u2013 safe, fast, and cost-effective for marine and infrastructure projects.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Steel Pipe Pile Extraction by Vibro Hammer on Barge Crane \u2013 Safe and Efficient Marine Solution\" \/>\n<meta property=\"og:description\" content=\"PLC provides professional steel pipe pile extraction by vibro hammer on barge cranes \u2013 safe, fast, and cost-effective for marine and infrastructure projects.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\" \/>\n<meta property=\"og:site_name\" content=\"PLC JSC\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/MayxaydungPLC\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-13T08:24:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-13T15:49:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-4.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@doanduvtv\" \/>\n<meta name=\"twitter:site\" content=\"@doanduvtv\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\",\"url\":\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\",\"name\":\"Steel Pipe Pile Extraction by Vibro Hammer PLC\",\"isPartOf\":{\"@id\":\"https:\/\/plc-corp.vn\/eng\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html#primaryimage\"},\"image\":{\"@id\":\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html#primaryimage\"},\"thumbnailUrl\":\"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-4.jpeg\",\"datePublished\":\"2025-09-13T08:24:09+00:00\",\"dateModified\":\"2025-09-13T15:49:49+00:00\",\"author\":{\"@id\":\"https:\/\/plc-corp.vn\/eng\/#\/schema\/person\/1154444ccbad7b0f41f7aae1f322258f\"},\"description\":\"PLC provides professional steel pipe pile extraction by vibro hammer on barge cranes \u2013 safe, fast, and cost-effective for marine and infrastructure projects.\",\"breadcrumb\":{\"@id\":\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html#primaryimage\",\"url\":\"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-4.jpeg\",\"contentUrl\":\"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-4.jpeg\",\"width\":1024,\"height\":768},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Trang ch\u1ee7\",\"item\":\"https:\/\/plc-corp.vn\/eng\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mechanical Construction\",\"item\":\"https:\/\/plc-corp.vn\/eng\/mechanical-construction\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Steel Pipe Pile Extraction by Vibro Hammer on Barge Crane \u2013 Safe and Efficient Marine Solution\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/plc-corp.vn\/eng\/#website\",\"url\":\"https:\/\/plc-corp.vn\/eng\/\",\"name\":\"PLC JSC\",\"description\":\"C\u00f4ng ty cho thu\u00ea c\u1ea9u, uy t\u00edn, chuy\u00ean nghi\u1ec7p.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/plc-corp.vn\/eng\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/plc-corp.vn\/eng\/#\/schema\/person\/1154444ccbad7b0f41f7aae1f322258f\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/plc-corp.vn\/eng\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/plc-corp.vn\/eng\/wp-content\/litespeed\/avatar\/ce6063dbbdf8fd24424b5cbc63bd1bee.jpg?ver=1791918252\",\"contentUrl\":\"https:\/\/plc-corp.vn\/eng\/wp-content\/litespeed\/avatar\/ce6063dbbdf8fd24424b5cbc63bd1bee.jpg?ver=1791918252\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Steel Pipe Pile Extraction by Vibro Hammer PLC","description":"PLC provides professional steel pipe pile extraction by vibro hammer on barge cranes \u2013 safe, fast, and cost-effective for marine and infrastructure projects.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html","og_locale":"en_US","og_type":"article","og_title":"Steel Pipe Pile Extraction by Vibro Hammer on Barge Crane \u2013 Safe and Efficient Marine Solution","og_description":"PLC provides professional steel pipe pile extraction by vibro hammer on barge cranes \u2013 safe, fast, and cost-effective for marine and infrastructure projects.","og_url":"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html","og_site_name":"PLC JSC","article_publisher":"https:\/\/www.facebook.com\/MayxaydungPLC\/","article_published_time":"2025-09-13T08:24:09+00:00","article_modified_time":"2025-09-13T15:49:49+00:00","og_image":[{"width":1024,"height":768,"url":"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-4.jpeg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_creator":"@doanduvtv","twitter_site":"@doanduvtv","twitter_misc":{"Written by":"admin","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html","url":"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html","name":"Steel Pipe Pile Extraction by Vibro Hammer PLC","isPartOf":{"@id":"https:\/\/plc-corp.vn\/eng\/#website"},"primaryImageOfPage":{"@id":"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html#primaryimage"},"image":{"@id":"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html#primaryimage"},"thumbnailUrl":"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-4.jpeg","datePublished":"2025-09-13T08:24:09+00:00","dateModified":"2025-09-13T15:49:49+00:00","author":{"@id":"https:\/\/plc-corp.vn\/eng\/#\/schema\/person\/1154444ccbad7b0f41f7aae1f322258f"},"description":"PLC provides professional steel pipe pile extraction by vibro hammer on barge cranes \u2013 safe, fast, and cost-effective for marine and infrastructure projects.","breadcrumb":{"@id":"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html#primaryimage","url":"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-4.jpeg","contentUrl":"https:\/\/plc-corp.vn\/eng\/wp-content\/uploads\/2025\/09\/Rung-nho-coc-ong-thep-4.jpeg","width":1024,"height":768},{"@type":"BreadcrumbList","@id":"https:\/\/plc-corp.vn\/eng\/steel-pipe-pile-extraction-by-vibro-hammer-on-barge-crane-safe-and-efficient-marine-solution.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Trang ch\u1ee7","item":"https:\/\/plc-corp.vn\/eng\/"},{"@type":"ListItem","position":2,"name":"Mechanical Construction","item":"https:\/\/plc-corp.vn\/eng\/mechanical-construction"},{"@type":"ListItem","position":3,"name":"Steel Pipe Pile Extraction by Vibro Hammer on Barge Crane \u2013 Safe and Efficient Marine Solution"}]},{"@type":"WebSite","@id":"https:\/\/plc-corp.vn\/eng\/#website","url":"https:\/\/plc-corp.vn\/eng\/","name":"PLC JSC","description":"C\u00f4ng ty cho thu\u00ea c\u1ea9u, uy t\u00edn, chuy\u00ean nghi\u1ec7p.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/plc-corp.vn\/eng\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/plc-corp.vn\/eng\/#\/schema\/person\/1154444ccbad7b0f41f7aae1f322258f","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/plc-corp.vn\/eng\/#\/schema\/person\/image\/","url":"https:\/\/plc-corp.vn\/eng\/wp-content\/litespeed\/avatar\/ce6063dbbdf8fd24424b5cbc63bd1bee.jpg?ver=1791918252","contentUrl":"https:\/\/plc-corp.vn\/eng\/wp-content\/litespeed\/avatar\/ce6063dbbdf8fd24424b5cbc63bd1bee.jpg?ver=1791918252","caption":"admin"}}]}},"_links":{"self":[{"href":"https:\/\/plc-corp.vn\/eng\/wp-json\/wp\/v2\/posts\/5417"}],"collection":[{"href":"https:\/\/plc-corp.vn\/eng\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/plc-corp.vn\/eng\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/plc-corp.vn\/eng\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/plc-corp.vn\/eng\/wp-json\/wp\/v2\/comments?post=5417"}],"version-history":[{"count":2,"href":"https:\/\/plc-corp.vn\/eng\/wp-json\/wp\/v2\/posts\/5417\/revisions"}],"predecessor-version":[{"id":5423,"href":"https:\/\/plc-corp.vn\/eng\/wp-json\/wp\/v2\/posts\/5417\/revisions\/5423"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/plc-corp.vn\/eng\/wp-json\/wp\/v2\/media\/5421"}],"wp:attachment":[{"href":"https:\/\/plc-corp.vn\/eng\/wp-json\/wp\/v2\/media?parent=5417"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/plc-corp.vn\/eng\/wp-json\/wp\/v2\/categories?post=5417"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/plc-corp.vn\/eng\/wp-json\/wp\/v2\/tags?post=5417"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}