Wind turbines installation in Philippines with professional services

0 96

PLC provide professional wind turbines installation services in Philippines.

PLC has been deploying crane and installation services for many wind power projects in Vietnam.

PLC has completed the installation and COD of many onshore wind farm. We are also taking steps to participate more deeply in offshore wind power projects.

After the installation process, PLC has been highly appreciated by investors, general contractors and turbine manufacturers.

The main turbine types that we are actively deploying are Envision, Enercon, Vestas, Ming Yang, GE and Siemens Gamesa.

We are going to providing transportation and installation for onshore wind turbines in Philippines.

Overview of PLC’s wind turbine transport and installation services: PLC_ROCHURE_2023

Strengths in PLC’s wind turbine installation services in Philippines

Renewable energy in general and wind energy in particular is increasingly becoming an inevitable trend of the times in over the world.

The accompanying services for transportation and crane installation of wind power are therefore also increasingly developed and perfected.

However, the rapid growth in service scale does not mean the immediate synchronous improvement of capacity in terms of equipment and human resources. Especially, it is necessary for human resources to have time to train and get acquainted to be able to access the latest technologies of wind turbines. In which, in addition to technological barriers, the human resource with skills in lifting and lowering super-heavy weights is also a big difficulty. This is a particularly important issue because it is related to occupational safety, the very high value of the turbine as well as the quality of the turbines after the installation process.

PLC is very lucky because it has access to technologies and implemented the lifting and lowering of super-heavy weights very early.

The key technical staff of PLC are those who have taken up the main heavy lifting positions in projects such as Nhat Tan Bridge, Terminal T2 of Noi Bai International Airport, Nghi Son Refinery, Dung Quat Oil Refinery…

We also receive technology and accompany the world’s leading heavy-duty installation contractors such as Nippon Express, Sumitomo Mitsui, IHI Infrastructure, JGC, Hyundai E&C, Samsung C&T…

Therefore, PLC’s wind turbine installation services has many outstanding advantages such as belows:

  • Highly qualified human resources with fluent English.
  • Well trained and experienced in heavy lifting and moving services.
  • Advanced lifting and moving skills.
  • Extensive knowledge of the heavy equipment.
  • Professional work ethic.
  • Always aiming for the criteria of high quality providing services.

TBM before start working at site

Why need a professional wind turbine installation service?

Wind turbines have always been the gathering place of continuous scientific and technical innovations to bring about maximum power generation efficiency.

Wind turbines have always been a gathering place of continuous scientific and technical innovations to deliver maximum power generation efficiency with ever larger wind turbines.

In addition to the continuous application of the most advanced engineering technologies, wind turbines are becoming larger, heavier, and longer blades for optimal return on investment.

Even under the most normal conditions, hoisting turbine components, especially 3-blade assemblies with diameters of about 140-180m, is already a very complicated job. Not to mention the frequent and irregular effects of winds, the difficulty of navigating by wind in complex terrain, this crane installation is always a very difficult job to do. In addition to hoisting and installing the turbine in place, it is also very difficult to ensure strict technical quality requirements.

So in the Philippines in particular and in other wind farms around the world in general, turbine installation services always require special skills.

In addition, the installation of wind turbines in progress conditions to enjoy the preferential electricity price of FIT is an extremely stressful job. In a fixed period of time, the wind turbine crane construction unit must use all possible technical and time measures to ensure the set schedule.

And the most important thing is to ensure absolute safety in the process of providing wind turbine installation services. Insecurity during the installation of wind turbines will have serious consequences. Therefore, ensuring safety is always a top priority.

Typical wind power projects that we have completed

Phuong Mai 1 Wind Power Project (26.4Mw)

Location: Binh Dinh province

Client: DONG DO GROUP

Turbine OEM: GE 2.4Mw-116 x 12WTG

Scope of works: Cranes services ; Assemble/Dismantle/Moving cranes services

Tai Tam Wind Power Project (48MW)

Location: Quang Tri province

Client: TAI TAM GROUP

Turbine OEM: Envision EN141-3.3Mw x 15 WTG

Scope of works: Cranes services; Installation of wind turbines; Technical services

Hoang Hai Wind Power Project (51.2MW)

Location: Quang Tri province

Client: TAI TAM GROUP

Turbine OEM: Envision EN141-3.3Mw x 16 WTG

Scope of works: Cranes services; Installation of wind turbines; Technical services

Huong Linh 3 Wind Power Project (30MW)

Location: Quang Tri province

Client: SINOHYDRO

Turbine OEM: Envision EN141-3.3Mw x 9 WTG

Scope of works: Cranes services; Transportation services; Technical services

Huong Linh 4 Wind Power Project (30MW)

Location: Quang Tri province

Client: Huong Linh 4

Turbine OEM: Envision EN141-3.3Mw x 9 WTG

Scope of works: Cranes services; Transportation services; Installation services; Technical services

Gelex 1,2,3; Huong Linh 7,8; Huong Phung 2,3  Wind Power Project (144MW)

Location: Quang Tri province

Client: SCI GROUP

Turbine OEM: Enercon E-126 EP3-4.5Mw x 10 WTG

Scope of works: Cranes services; Transportation services; Installation services; Technical services

Phong Nguyen wind power project

Location: Quang Tri province

Client: VESTAS

Turbine OEM: Vestas V150

Scope of works: Cranes services; Dismantle/ Installation services; Technical services

Vien An Wind Power Project (50MW)

Location: Ca Mau province

Client: TAI TAM GROUP

Turbine OEM: Mingyang 3.3MW x 8 WTG

Scope of works: Technical services

Some pictures and projects we have completed

500T crawler crane Zoomlion ZCCC9800 at Hoang Hai Wind Farm Project

500T crawler crane Zoomlion ZCCC9800 at Tai Tam Wind Farm Project

800T crawler crane Sany SCC8000A at Tai Tam Wind Farm Project

600T crawler crane Demag CC2800-1 at Hoang Hai Wind Farm Project

 

600T crawler crane Demag CC2800-1 at Hoang Hai Wind Farm Project

 

Zoomlion ZCC5800 at Gelex 1,2,3 Wind Farm Project

600T crawler crane Demag CC2800-1 at Huong Linh 7,8 Wind Farm Project

For more information about wind turbine installation services in Philippines and wind turbine transportation service, please contact us:

Mobile number: +84972521693

Email: info@plc-corp.vn

Website: htts://plccorp.vn  ;  https://plc-corp.vn

You might also like
Leave A Reply

Your email address will not be published.


The reCAPTCHA verification period has expired. Please reload the page.