Professional, Full Package Offshore Piling Services in Vietnam
View more posts: >>>Crawler crane rental services in Vietnam from 50 ton to 1600 ton<<<
Applications of Offshore Piling Services
Piling and pile driving have various applications in the construction of civil and industrial infrastructure. Offshore, pre-stressed concrete piles and steel piles are prominently used in:
Port Infrastructure: Pre-stressed concrete piles are the main support for most ports in Vietnam, ensuring stability, load-bearing capacity, and extended lifespan.
Industrial Infrastructure Construction: Our services provide safe and efficient solutions for constructing critical transmission infrastructure, such as foundations for offshore power transmission lines, fuel port docks, and other material transport systems.
Nearshore Wind Turbine Foundations: Pre-stressed concrete piles and steel pipe piles are the primary foundation types for nearshore wind turbines in Vietnam.
Why Choose PLC’s Full Package Offshore Piling Services in Vietnam?
Challenges of Offshore Piling Construction
Offshore piling involves a combination of heavy machinery use and seafaring experience to execute the construction work. Besides a deep understanding of heavy machinery and maritime equipment, the construction team must possess substantial seafaring experience.
Our team must handle various subjective and objective situations during construction, ensuring safety, quality, and progress. This expertise guarantees the safety of personnel, the construction process, and the overall quality and timeline of the project.
Professional, Full Package Offshore Piling Services in Vietnam
Safety: Safety is always our top priority in all PLC services.
Quality: PLC places special emphasis on piling construction quality, especially for high-value and critical offshore projects.
Time and Cost Efficiency: Despite the complexity of this construction service, our experience and skills ensure quick and efficient execution, reducing time and costs for general contractors and investors.
High-Quality Workforce
Our team of skilled engineers and workers has deep expertise and extensive experience:
Seafaring Experience: Our team has years of direct sea experience, enabling them to handle all possible scenarios and solve problems quickly and accurately.
Construction Control: Confidence and precision in every construction stage ensure project quality and progress.
Problem-Solving: Our team is trained to handle all difficult situations, continuously updating skills and knowledge to maintain flexibility and innovation in construction.
Natural Factor Understanding: Our team understands the natural elements in the offshore construction area:
Climate: We are well-versed in the climate changes in offshore areas, allowing us to plan and adjust construction work flexibly and effectively.
Rainy and Windy Seasons: We predict and respond to the unique rainy and windy seasons of each region to ensure safety and stability during construction.
Tides: Understanding tidal cycles and sea level changes helps us determine the most suitable construction times and methods.
View more posts : >>>Heavy Lifting & Moving<<<
Advantages and Disadvantages of the Service
Advantages of Full Package Offshore Piling Services in Vietnam
Cost-effective: Compared to other construction methods, our offshore concrete piling service has relatively low costs, saving clients money.
High Vertical Load Capacity: Pre-stressed concrete piles can bear substantial vertical loads, suitable for projects requiring high durability and stability.
Disadvantages of Full Package Offshore Piling Services in Vietnam
Geographical Limitations: This method is only suitable for shallow water areas up to 12m deep, not for deep-sea projects.
Lower Uplift Resistance: Compared to bored piles, pre-stressed concrete piles and steel pipe piles have lower uplift resistance, potentially affecting durability and stability if natural conditions change.
Notable Offshore Piling Projects by PLC
- DKC Fuel Oil Docking Pier (2017-2019) – Nghi Thiet, Nghe An: PHC and steel pipe piling (D600 – D800, length 36m-48m).
- Vissai International Port – Nghe An: Steel pipe piling (D1000).
- 220KV Kien Binh – Phu Quoc Offshore Power Tower: 1800-ton barge with 150-ton crane, 8-ton diesel hammer for PHC piling (D700, D800).
- Dong Hai 1 Wind Power – Bac Lieu: 3800-ton barge with 200-ton crane for turbine foundation piling (PHC D800, length 63-76m).
- Hoa Binh 1,2 Wind Power – Bac Lieu: 3800-ton barge with 200-ton crane for turbine foundation piling (PHC D800, length 63-76m).
- Ben Tre V1-3 Wind Power – Ben Tre: 1800-ton barge with 150-ton crane for turbine foundation piling (PHC D800, length 55-60m).
- Soc Trang 7 Wind Power – Soc Trang: 1800-9000 ton barge with 150-300 ton crane for turbine foundation piling (PHC D800, length 60-66m).
- VPL Ben Tre: 1800-9000 ton barge with 150-300 ton crane for turbine foundation piling (PHC D800, length 55-66m).
View more posts : >>>Several projects PLC has participated inVietnam<<<
Some pictures of PLCs Full Package Offshore Piling Services in Vietnam
200 ton crawler crane on 2000 ton barge
250 ton crawler crane on 2000 ton barge
250 ton crawler crane pilling on the sea
150 ton crawler crane on 3000 ton barge
300 ton crawler crane pilling on 5000 ton barge
Contact Us
For more detailed information and quotes, please contact us:
- Phone/WhatsApp: (+84) 972 521 693
- Email: info@plc-corp.vn
- Website: www.plc-corp.vn
In addition to piling construction services, PLC is a leading provider of heavy lifting and transportation services in Vietnam. We look forward to collaborating with all partners and customers nationwide.