Huong Linh 4 Wind Power Project
Congratulation to wind power team of PLC who has successfully completed the transportation and installation of Huong Linh 4 Wind Power Project!
The project was completed on schedule with absolute safety.
The project information is as follows:
Investor: Huong Linh 4 Wind Power JSC.
Turbine OEM: Envision, model EN141-3.3MW.
Number of turbines: 10 turbines
Project location: Huong Hoa district, Quang Tri province.
Scope of work: Transport, installation and commissioning (From December 2021 to March 2022)